 |
 |
| |
Setup a small windmill |
|
 |
ENR01-5 |
|
• Acquire the basic techniques of a small windmill
• Apply a sizing and installation method of a windmill generator greater than 36 KVA |
|
 |
| |
Cold water production |
|
 |
PEG01 |
|
- To be able to perform setup, troubleshooting and maintenance of cold water production units. |
|
 |
| |
Applied electricity for photovoltaic installations |
|
 |
ENR01-0 |
|
• Understand the electrical characteristics of components of a photovoltaic system.
• Understand the electrical risks of solar generators and the respect of protection rules described in the guide UTE C 18-510.
• Perform electrical wiring following good practices.
• Troubleshoot devices |
|
 |
| |
Assembly of a photovoltaic project on an electricity grid |
|
 |
ENR01-2 |
|
• Interpret the technical and financial feasibility study of a project.
• Evaluate the return on investment and the profitability of a PVR power plant.
• Organize, with the different actors, the planning of administrative, contractual and installation steps. |
|
 |
| |
European energy manager |
|
 |
EUREM |
|
• Develop and acquire new skills.
The EUREM training develops economic and technical skills in a company or collectivity to bring efficient and innovative solutions to new energetic issues.
• Apply through practice with a tutorial project. |
|
 |
| |
Practice of simple refrigeration circuits |
|
 |
FR12 |
|
• Master the operation of a refrigeration circuit of less than 2 kg of refrigeration fluid.
• Intervene on common maintenance operations
• Perform devices tuning |
|
 |
| |
Refrigeration fluids and regulations |
|
 |
FR35 |
|
• Extract and confine refrigeration fluids with respect of legislation.
• Respect regulations on refrigeration fluids recovering.
• Choose and setup refrigeration fluids of type H.C.F.C. or H.F.C. |
|
 |
| |
Lighting energy savings |
|
 |
MDE 01 |
|
• Acquire the basic techniques of lighting.
• Establish an efficiency diagnosis following the performance of an installation.
• Realize energy savings thanks to optimization. |
|
 |
| |
Air conditioning - Heating with reversible heat pumps (SPLIT-SYSTEM) |
|
 |
PAC 01 |
|
• Acquire the basic knowledge of reversible heat pumps.
• Accomplish a simplified thermal balance, select product, know installation procedures and setup.
• Acquire basic knowledge for maintenance and troubleshooting reversible heat pumps. |
|
 |
| |
Temperature systems control initiation |
|
 |
RE01 |
|
• To be able to wire, tune and troubleshoot analog control loops.
• Apply the basic control principles.
• Study the technology of control equipments (sensors, valves, controllers, ...) |
|
 |
| |
Master Mechanical Extract Ventilation |
|
 |
VMC 01 |
|
• Master the regulatory aspect of MEV.
• Master calculations, installation and maintenance of MEV systems.
• Troubleshoot MEV systems. |
|
 |
| |
Sizing and design of an air conditioning installation |
|
 |
CL02-1 |
|
• Perform installation energy and aerodynamics balance.
• Design, modify or optimize an air conditioning installation. |
|
 |
| |
Setup and use an air conditioning installation |
|
 |
CL02-2 |
|
• Perform installation energy and aerodynamics balance.
• Warrant preventive and corrective maintenance.
• Modify or optimize an air conditioning installation. |
|
 |
| |
Solar photovoltaic electrical energy generation |
|
 |
ENR01-1 |
|
• Apply a solar energy design method
• Bring an adapted solution in regards to specifications with administrative, technical and commercial considerations.
• Apply the installations steps on a site
• Exploit a power plant and manage its maintenance needs. |
|
 |
| |
Lighting energy savings |
|
 |
ENR01-3 |
|
• Acquire the basic techniques of lighting.
• Establish an efficiency diagnosis following the performance of an installation.
• Realize energy savings thanks to optimization. |
|
 |
| |
Electrical design of a photovoltaic power plant greater than 18 KVA |
|
 |
ENR01-4 |
|
• Establish the electrical record of a photovoltaic installation greater than 3 KVA following regulations.
• Choose and number the necessary electrical devices.
• Establish the technical documents of a public grid connection project. |
|
 |
| |
Practice of complex refrigeration circuits |
|
 |
FR22 |
|
• Master the operation of refrigeration circuits of more than 2 kg of refrigeration fluid.
• Answer to all maintenance problems
• Understand industrial installations technologies, pressure controllers, temperature controllers. |
|
 |
| |
Troubleshooting refrigeration installations |
|
 |
FR30 |
|
• Diagnose refrigeration installations after analysis and synthesis of tests and events.
• Fix with a strict method most incidents on refrigeration systems.
• To be able to find more complex failures.
• Acquire methodology through a logical analysis of different circuits. |
|
 |
| |
Optimize and air conditioning installation |
|
 |
MDE 04 |
|
• Study different technical solutions in order to obtain a better energetic efficiency. |
|
 |
| |
Connecting electrical installations to the ERDF network |
|
 |
RERDF |
|
• To be able to modify or install counting or control panels of an electrical power plant of power greater or equal to 36 KVA. |
|
 |
| |
Setup, exploit and maintain a thermal solar installation |
|
 |
SOL-TH01 |
|
• Identify thermal solar installation devices (individual and collective).
• Acquire the necessary knowledge to setup, exploit and troubleshoot these installations. |
|
 |
| |
Size, design a thermal solar installation |
|
 |
SOL-TH02 |
|
• Evaluate needs in hot sanitary water in different building types.
• Acquire the necessary knowledge for sizing, design, selection and setup of solar thermal systems. |
|
 |
 |